Logistics Project

Cocoa and Coffee Warehouse Facility — Turnkey Build

Complete logistics hub with temperature-controlled storage, inspection lines and full export processing capacity.

Category: Logistics ProjectClient: Internal OperationsDestination: IndonesiaYear: 2026
Cocoa and Coffee Warehouse Facility — Turnkey Build

Project Overview

A turnkey logistics facility designed to handle the full export journey of our cocoa and coffee programs — from intake inspection to stuffing and dispatch.

Facility Highlights

  • Warehousing: 5,400 m² temperature-controlled storage
  • Inspection: Dedicated QC lines with cupping lab
  • Processing: Cleaning, grading and moister-control lines
  • Loading: 8 dock levellers with sealed container staging area

Sustainability

The facility runs on solar-assisted power, uses rainwater recovery for cleaning, and has cut packaging waste by 40% with reusable liners.

Results

With the new facility, average container turnaround dropped from 9 days to 2.5 days, unlocking significantly higher throughput during peak harvest season.